Plan the session. Remove dross after at least 6 h without dipping (overnight settling), bath at normal working temperature. Do not stir the bath before grabbing.
Pre-start checks. 6 bar at FRL; couplings connected; lever CLOSE closes the jaws; pins move freely; lip wear bars intact; hose sleeves in place; rim rest pinned at the set hole on both sides.
Dry the grab. Hang with the shells 200–300 mm above zinc for 10 min. Repeat after any washing, rain or condensation. A wet grab causes a zinc eruption.
Skim and lower. Skim surface ash at the bite position. Open jaws in air, lower at creep speed until the rim rest lands on both kettle flanges. Slack the hook about 50 mm.
Bite. Hold lever at CLOSE until lips meet (≈ 4 s), hold 3 s more, release to centre.
Lift and drain. Take up slack, lift at creep for the first 500 mm. Stop with the bowl 100–200 mm above zinc for 30 s so free zinc drains back through the perforations.
Dump. Traverse at creep to the pre-heated, dry dross moulds. Lower to 150 mm above the mould, OPEN, cycle the jaws twice to shake out.
Next bite. Step 500–600 mm along the kettle per bite, working from one end. Keep cycling the jaws in air between bites while hot, so zinc does not freeze at the pins.
Park. Close jaws, park on the stand over a drip tray, isolate and vent air, disconnect couplings and cap them, return hoses to the reel.
Exclusion zone 3 m around the kettle while the grab moves. Operator at the valve stand with face shield, aluminised jacket and gloves. Nobody under the suspended grab. Never let the grab strike kettle walls or floor: kettle damage is the costliest failure in the plant. Do not use the grab to lift anything else.