Plan your plant · SHIVAS Technology

Galvanizing plant calculator

Choose the steel you galvanize, how much you want to make a month and your zinc kettle. The calculator gives the largest article it takes, sizes the furnace, pretreatment line and cranes, and works out zinc, fuel, acid, power, labour and your running cost per tonne. Every rate below is yours to change.

1What you galvanize

2How much a month

3Your zinc kettle

The largest article follows the SHIVAS kettle rule in reverse: its length and width are the kettle's less 100 mm, and its height as dipped is the depth less 200 mm (100 mm of zinc below the article and 100 mm left empty at the top).

4Fuel

5Your rates

SHIVAS recommended rates; change them to yours
Chemical prices and dosages behind these rates
ChemicalPriceDosage or use
Flux bath
Water flux₹ 72 / kg42 % by volume
Zinc chloride₹ 104 / kg5 %
Glycerin₹ 170 / kg1 %
Liquid ammonia₹ 32 / litre30 to 35 litres every third day
Cleaning and surface treatment
Degreaser₹ 57 / kgConcentration 32 to 35 %
Hydrochloric acid₹ 4 / kg25 kg per tonne of steel
Hydrogen peroxide₹ 58 / kg100 litres for a 7 m tank
Chromic acid₹ 360 / kg0.4 % of bath volume
Zinc and by-products
Zinc₹ 450 / kgPurchase price
Zinc ash₹ 90 / kg (20 % of zinc)15 % of zinc consumed
Zinc dross₹ 370 / kg (82.2 % of zinc)Sold back

Chemical cost per tonne of steel: degreaser, acid, flux and dichromate ₹ 500, plus additional hydrochloric acid 25 kg × ₹ 4 = ₹ 100, so ₹ 600 a tonne in all.

6Plant assumptions

Typical values for a well-run plant

From our engineers

Practical notes from the engineers who design and build these plants.

All articles from our engineers →