PP and PP-H resist the acids used in pickling and galvanizing.
PP & PP-H process tanks
PP and PP-H process tanks for pickling, degreasing, rinse, flux and storage, butt-fusion and extrusion welded and braced for the full liquid load.
- PP-H / PP
- Thermoplastic welding
- Steel or FRP bracing
- Heated options
Overview
Thermoplastic tanks do not corrode in hydrochloric or sulphuric acid, and they outlast lined steel in most pickling and surface-treatment duties. Their weak point is creep under load and heat, which is why wall thickness and bracing matter more than anything else.
SHIVAS Reinplast designs each tank for its liquid, temperature and size, following DVS practice: wall thickness from the liquid head, bracing channels at calculated spacing, and welding by butt-fusion and extrusion. Lip extraction, nozzles, heating coils and covers are built in.
Why it pays
Wall and bracing calculated for the liquid head and temperature.
Nozzles, lip slots, coils and covers fitted.
No lining to fail.
Technical specification
Typical ranges. Every unit is sized to your duty; the offer carries the exact figures.
| Material | PP-H, PP-copolymer, PP-FRP, FRP |
|---|---|
| Shapes | Rectangular, round, conical or slanted bottom |
| Bracing | Coated steel channels or FRP |
| Welding | Butt-fusion and extrusion, DVS practice |
| Temperature | Up to about 80 to 90 °C for PP-H; higher with FRP |
| Fittings | Nozzles, overflows, drains, lip extraction, coils |
Types we build
- Rectangular
- Round and cylindrical
- Conical bottom
- Slant bottom
- Horizontal PP-H
- Butt-fusion welded
- Extrusion welded
- DVS-standard design
- Degreasing and galvanizing
- ETP tanks
How it works
PP / FRP tank · suction hood
Watch it run →A PP-H tank braced for its full liquid load, with lip extraction along the edge that catches fume right at the surface. Wider tanks take slots on both sides, or a push-pull system where an air curtain sweeps fume across to the exhaust hood.
Shown running as: Single-side lip · Double-side lip · Push-pull
Main parts
- 1PP-H tank wallWelded PP-H, sized for the liquid head.
- 2External bracingSteel or FRP ribs keep the walls straight when full.
- 3Lip slotNarrow slot along the edge pulls fume at the surface.
- 4Suction plenumEvens suction along the full tank length.
- 5Exhaust ductFRP duct to the scrubber.
- 6Push jetAir curtain across the surface (push-pull only).
- 7Capture zoneFume taken before it rises into the shed.
At a glance
- Tank
- PP-H / PP / FRP
- Bracing
- Steel or FRP
- Extraction
- Lip, double lip, push-pull
- Duct
- FRP to scrubber
Options, build and uses
Options
- Covers and lids
- Heating and cooling coils
- Insulation
- Level and temperature sensors
How we build it
- Fabricated in our PP/FRP shop
- Hydro tested
Who it is for
- Galvanizing pretreatment
- Pickling plants
- Plating and anodizing
- Chemical storage
Part of
3D model
Computer model from a real SHIVAS project. It shows the arrangement; it is not a photo.
From our engineers
Questions buyers ask
PP-H or FRP?
PP-H for most acid baths to about 80 °C; FRP or PP-FRP for very large tanks or higher temperatures.
How thick are the walls?
Calculated from height, temperature and material; we send the design basis with the offer.
Get a quote
Tell us the capacity, sizes and site. We reply with a scheme, a layout and an offer.
What we need for your quote
- Inside size
- Liquid and concentration
- Temperature
- Fittings needed
