No acid fume.
Fumeless pickling line
Turnkey lineFumeless pickling lines: wire cleaned in covered tanks with no acid fume in the shed.
- Drawing: Not in line or Inline drawing
- Take-up: Coilers or Spoolers
Overview
Fumeless pickling runs strands through covered tanks with controlled acid and temperature, so fume stays in the equipment and is drawn off to a small scrubber.
Tank lids and strand slots are designed so very little air enters, which keeps the extraction small. Acid strength, temperature and iron are held in a narrow band; rinsing is cascaded; the small scrubber stream can go to acid recovery.
Why it pays
Controlled baths.
Technical specification
Typical ranges. Every unit is sized to your duty; the offer carries the exact figures.
| Tanks | Covered PP-H |
|---|---|
| Strands | Multi-strand |
| Extraction | Small scrubber |
Calculator
Work it out for your own plant. Every input is a typical value you can change and the results follow as you type; send the result to us and we reply with a proposal.
Every stage of the line
In order from the coil going in to the coil coming out. Watch it run in the wire lines section.
- Pay-off
- 1Rod pay-offsTechnology
Overhead or rotating pay-offs feed hot-rolled rod. Butt welding joins each new coil to the last, so strands never need re-threading.
- Feed
- Hot-rolled rod coils
- Joining
- Butt welding
- Built by
- SHIVAS Technology
- Pretreatment
- 2Mechanical descalerTechnology
Reverse-bending rolls crack the mill scale and brushes take it off. Most of the scale leaves dry, so the acid lasts much longer.
- Method
- Reverse bending + brushing
- Scale
- Collected dry
- Gain
- Less acid, less iron load
- 3Fumeless HCl picklingReinplast
Two covered tanks in series. The rod meets the older acid first and the fresh acid last, while the acid cascades the other way, so it’s used up before it goes to regeneration. Lids, water seals and slot extraction keep the fume in the tank.
- Chemistry
- HCl 12–18 % + inhibitor
- Temperature
- Ambient to 35 °C
- Flow
- Counter-current cascade
- Build
- PP-H tanks, FRP lids, PP pumps
- 4High-pressure spray rinseReinplast
Jets strip loose smut and acid from the rod surface before the rinse tanks.
- Nozzles
- High-pressure, ring headers
- Water
- Recirculated
- Build
- PP-H spray box
- 5Cascade rinseReinplast
Two or three counter-flow stages with a spray at the exit. Clean water enters only at the last stage, so water use stays low and the overflow goes to the ETP.
- Stages
- 2–3, counter-flow
- Overflow
- To ETP or acid make-up
- Build
- PP-H tanks, PP spray headers
- Coating
- 6Carrier coatingReinplast
A zinc phosphate, borax or lime carrier holds the drawing soap in the die and protects the rod until it is drawn.
- Chemistry
- Zinc phosphate, borax or lime
- Temperature
- ≈ 60–90 °C
- Sludge
- Filter loop on the tank
- Build
- PP-H tank, PTFE heating
- Post-treatment
- 7DryerTechnology
Hot air sets the coating so it doesn’t smear in the soap box.
- Temperature
- ≈ 120–180 °C
- Build
- Insulated box, hot-air blower
- Drawing
- 8Inline drawingTechnologyOption: Inline drawing
A straight-line drawing machine in the line takes the clean, coated wire straight down to size, with no coil handling between pretreatment and drawing.
- Machine
- Straight-line, multi-block
- Lubricant
- Soap in rotating die boxes
- Cooling
- Water-cooled blocks
- Built by
- SHIVAS Technology
- Take-up
- 9CoilersTechnology
A coiler for each strand, inverted vertical or dead block, building tight, heavy coils on carriers while the line keeps running.
- Package
- Coils on carriers
- Type
- Inverted vertical / dead block
- Drive
- AC inverter, PLC synced
Around the line
- Fume scrubber + FRP blower ReinplastEvery covered tank is extracted to a packed-bed scrubber, FRP blower and chimney.
- Acid regeneration ReinplastSpent acid goes back as fresh HCl and iron oxide.
- Phosphate sludge filter ReinplastKeeps the carrier bath clean between cleanouts.
- ETP + ZLD ReinplastRinse overflow is treated and reused.
Options, build and uses
Options
- Electrolytic cleaning
How we build it
- Fabricated by SHIVAS Reinplast
Who it is for
- Wire galvanizing and drawing plants
What this plant is built from
In process order. Each one has its own page.
06 FRP blowersSHIVAS Reinplast · 2 photos3D model
Computer model from a real SHIVAS project. It shows the arrangement; it is not a photo.
Questions buyers ask
Truly no fume?
Fume is contained inside the covered tanks and extracted.
From our engineers
Practical notes from the engineers who design and build these plants.
- Fumeless pickling for wire: keeping the acid inside the tankWire lines · 2 min read
- Acid fume from pickling: hoods, the packed scrubber and the blowerFume control · 2 min read
- When the shed still smells of acid: troubleshooting a fume scrubberFume control · 3 min read
- What to do with spent pickling acid: regenerate, recover or neutraliseEffluent · 2 min read
Get a quote
Tell us the capacity, sizes and site. We reply with a scheme, a layout and an offer.
What we need for your quote
- Strands, sizes, speed
