SHIVAS Reinplast · Products

Pickling plants

Pickling plants for strip, wire and batch work: tanks, fume capture, scrubbing and acid management designed as one.

  • Push-pull lines
  • Continuous lines
  • Fumeless wire
  • Pipe and structure
Pickling plants4 photos
Strip · wire · batchpush-pull, continuous, fumeless or dip
Closed acid looprecovery or regeneration
Fume capturedscrubbed before the stack

Overview

Pickling removes scale with acid, usually hydrochloric. A good plant controls acid strength, iron content and temperature so pickling is fast and acid use is low, and keeps the fume inside the equipment.

SHIVAS Reinplast designs strip pickling lines, fumeless multi-strand wire pickling and batch pickling for pipes, tubes and structures, with tanks, hoods, scrubbers, acid recovery and effluent treatment.

Why it pays

Lower acid use

Controlled concentration and iron.

Clean air

Hoods and scrubbers built in.

Long-life tanks

PP-H and FRP.

One designer

Tanks to effluent.

Technical specification

Typical ranges. Every unit is sized to your duty; the offer carries the exact figures.

TypesPush-pull or continuous strip, fumeless wire, batch dip
AcidHCl, H₂SO₄
TanksPP-H, FRP, PP-FRP
FumeLip or tunnel extraction to scrubber
Acid managementRecovery, regeneration or neutralisation
Line drawing

Calculator

Work it out for your own plant. Every input is a typical value you can change and the results follow as you type; send the result to us and we reply with a proposal.

How it works

Push-pull pickling line

Watch it run →

Each coil is threaded on its own: entry pinch rolls push the strip head through the acid tanks until the recoiler grips it and pulls the coil through at speed. No welder and no loopers, so it suits mixed widths and gauges.

Main parts

  1. 1
    UncoilerHolds the hot-rolled coil.
  2. 2
    Pinch rolls + levellerPush the strip head and flatten it.
  3. 3
    ShearCrops head and tail.
  4. 4
    Pickling tanksShallow, covered HCl tanks.
  5. 5
    RinseCascade spray rinse.
  6. 6
    DryerHot air dries the strip.
  7. 7
    OilerLight oil film against rust.
  8. 8
    RecoilerGrips the head and pulls the coil through.

At a glance

Threading
Coil by coil
Welder
None
Loopers
None
Suits
Mixed widths, gauges

Continuous pickling line

Watch it run →

Coil ends are welded together so strip never stops in the acid. An entry looper stores strip while the entry section halts for each weld, and an exit looper does the same at the coiler, so the process section runs at constant speed.

Main parts

  1. 1
    UncoilersOne runs while the next coil is prepared.
  2. 2
    Shear + welderCrops and welds the new coil to the old tail.
  3. 3
    Entry looperStores strip so the process never stops for a weld.
  4. 4
    Scale breakerTension leveller cracks scale before the acid.
  5. 5
    Pickling tanksLong turbulent HCl tanks.
  6. 6
    Rinse + dryerCascade rinse and hot-air drying.
  7. 7
    Exit looperBuffers strip during coil change at the exit.
  8. 8
    RecoilerCoils the finished strip.

At a glance

Strip
Welded, endless
Loopers
Entry + exit
Process speed
Constant
Suits
High tonnage

Fumeless wire pickling

Watch it run →

Wire runs as up to 50 parallel strands through fully covered acid, rinse and coating tanks. Covers and extraction keep the fume inside the line, so the shop stays clear. Set strands, speed and size to see the throughput.

Main parts

  1. 1
    Payoff standOne coil per strand, up to 50.
  2. 2
    Covered acid tanksClosed hoods with extraction; fume never reaches the shop.
  3. 3
    Cascade rinseCounter-flow rinse saves water.
  4. 4
    Coating tankBorax or phosphate carrier for drawing.
  5. 5
    DryerSets the coating.
  6. 6
    Take-upA coiler for each strand.
  7. 7
    ExtractionTo the scrubber.

At a glance

Strands
1 to 50
Fume
Contained
Rinse
Cascade
Coating
Borax / phosphate

Tunnel pickling

Watch it run →

The whole pretreatment line sits inside a closed tunnel. An internal hoist carries each jig from tank to tank; roller doors open only to let a jig in or out. Roof hoods pull the fume to a scrubber, fresh air enters low through louvres, and the shop floor stays clear of acid mist.

Shown running as: Running · Fume view

Main parts

  1. 1
    Tunnel enclosurePP / FRP-clad tunnel over the tank row. Fume stays inside.
  2. 2
    Entry doorFast roller door, opens only for the incoming jig.
  3. 3
    Exit doorOpens to hand the jig to the dryer.
  4. 4
    Internal hoistTravels on its own runway inside the tunnel and dips each jig.
  5. 5
    Process tanksDegrease, pickle, rinse and flux in PP-H.
  6. 6
    Roof extractionHoods along the roof keep the tunnel under slight negative pressure.
  7. 7
    Fume scrubberPacked-bed scrubber neutralises the acid fume.
  8. 8
    FRP blower + stackPulls the air through the scrubber and out of the stack.
  9. 9
    Fresh-air louvresMake-up air enters low and sweeps fume upward.

At a glance

Enclosure
PP / FRP
Handling
Internal hoist
Doors
Fast roller
Air
Negative pressure → scrubber

Closed-loop pickling

Watch it run →

Every waste stream from a pickling or galvanizing shop has somewhere to go. Spent acid goes to regeneration and comes back as acid, rinse water goes through the ETP and ZLD and comes back as water, fume is scrubbed, and what is left leaves as dry salt and filter cake.

Main parts

  1. 1
    Pickling tanksPP-H tanks with lip extraction.
  2. 2
    Fume scrubberScrubs the extracted fume; bleed goes to the ETP.
  3. 3
    Acid regenerationSpent acid back to fresh acid plus iron oxide.
  4. 4
    ETPNeutralise, settle, filter.
  5. 5
    ZLDRO, evaporator and ATFD.
  6. 6
    Water backPermeate and condensate return to the rinses.
  7. 7
    Solids outIron oxide, filter cake and dry salt.

At a glance

Acid
Regenerated
Water
Back to process
Fume
Scrubbed
Discharge
Zero liquid

Options, build and uses

Options

  • Rinse cascades
  • Hot air dryers
  • Acid regeneration

How we build it

  • Fabricated by SHIVAS Reinplast

Who it is for

  • Strip mills
  • Wire plants
  • Pipe and tube makers
  • Galvanizers

What this plant is built from

In process order. Each one has its own page.

From our engineers

Questions buyers ask

Can you reduce our acid bill?

Usually, by controlling iron and recovering acid; we start from your analysis.

Enquiry · Pickling plants

Get a quote

Tell us the capacity, sizes and site. We reply with a scheme, a layout and an offer.

What we need for your quote

  • Product and size
  • Throughput
  • Acid used today
  • Space

Other full lines and plants

See all products →